Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Power Supply Cable, Heater And Evaporator; Connecting The Light - Sentiotec Pro B3 Montage- Und Gebrauchsanweisung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Installation instructions, only for experts
Observe the following points when connecting the power to the sauna control unit:
● Installation may only be performed by a qualiied electrician or similarly quali-
ied person.
Please observe that in the event of a guarantee claim, a copy of the bill
from the electrician performing the work must be presented.
● Work on the sauna control unit may only be performed when the power has
been disconnected.
● There must be a ixed connection for the electrical power supply.
● A three-phase shut-off device with a 3 mm contact opening must be provided
during installation. This is provided by the fuse.
● Observe the connection diagram (Fig. 4) on page 24.
5.1.

Connecting the power supply cable, heater and evaporator

1. Guide the power supply, heater and evaporator cable through the cable
9
bushings
2. Connect the power supply cables to the terminal strip
with the connection diagram. Observe the operating instructions for the
respective devices.
3. If the evaporator does not feature an automatic low-water shut-off function,
then perform the following step as well:
● Use the wire jumper enclosed to connect terminal "V1" to terminal "Wm".
5.2.

Connecting the light

1. Guide the light cable through the cable bushing
for 230 V/400 V
2. Connect the light cable to the terminal strip
nection diagram. Observe the operating instructions for the respective device.
WORLD OF WELLNESS
8
7
,
,
into the connection area for 230 V/400 V
f
.
c
b
into the connection area
d
in accordance with the con-
p. 18/38
f
.
in accordance

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pro-b3

Inhaltsverzeichnis