Herunterladen Inhalt Inhalt Diese Seite drucken

Siemens RVL481 Installationsanleitung Seite 41

Vorschau ausblenden Andere Handbücher für RVL481:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
11
Holiday period
12
Date of first day of
holiday
13
Date of last day of
holiday
14
Heating curve, flow
setpoint at 15 °C
outside temperature
15
Heating curve, flow
setpoint at –5 °C
outside temperature
26
Setpoint d.h.w.
temperature
NORMAL
27
D.h.w. temperature
28
Setpoint d.h.w.
temperature
REDUCED
31
Weekday (for swit-
ching program 2)
32
Start of first ON
period
33
End of first ON
period
34
Start of second ON
period
35
End of second ON
period
36
Start of third ON
period
37
End of third ON
period
Building Technologies
-
(1...8)
........................
--.--
(01.01 ... 31.12)
........................
--.--
(01.01 ... 31.12)
........................
30 °C
(20...70)
..................
60 °C
(20...120)
..................
55 °C
(20...100)
..................
Display function
40 °C
(8...80)
..................
1-7
(1...7)
.........................
05:00
(00:00...24:00)
.........................
22:00
(00:00...24:00)
.........................
--:--
(00:00...24:00)
.........................
--:--
(00:00...24:00)
.........................
--:--
(00:00...24:00)
.........................
--:--
(00:00...24:00)
.........................
74 319 0618 0 a
Day.Month
Day.Month
These operating lines are active
°C
only if digital adjustment of the
heating curve has been se-
lected (refer to entry made on
°C
operating line 73)
°C
With plant types x–0 and x–5,
these operating lines do not
appear
°C
1 = Monday
2 = Tuesday, etc.
1-7 = entire week
Switching program 2
--:-- = period inactive
17.04.2008
en
41/276

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis