Herunterladen Inhalt Inhalt Diese Seite drucken

Setup Instructions; Environmental And Site Conditions; Transport And Unpacking; Connections - Sartorius Stedim Biotech Sartocheck 3 plus Betriebsanleitung

Filterintegritäts-testgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.3

Setup Instructions

5.3.1

Environmental and Site Conditions

Select a place of installation that
meets the following conditions:
– no significant heat irradiation from
heating or sunlight
– no strong airflows
– no chemically aggressive
environment
– no significant shocks
– no dust impingement
– no significant impingement of
humidity
5.3.2

Transport and Unpacking

The unit and its accessories are
packaged according to the national
custom and protected against
impacts. To avoid damaging the
equipment, please comply with the
following notes and instructions:
– Please observe the Technical Data
in Chap. 3.
– Please observe the weight.
For transport to the unpacking site,
use a floor truck if appropriate.
– To prevent the unit from slipping,
it should always be carried or lifted
by two people.
– To open the packaging, remove the
unit and place it on a workbench
or table intended for that purpose.
– The workbench or table must be
level and able to bear the appro-
priate load. Allow sufficient space
around the workbench or table
for the operator to work.
– Unpack the accessories and
technical documents and put them
in a safe place.
– Moisture in the air can condense
on the surfaces of a cold unit
whenever it is brought into a
substantially warmer place. If
you transfer the unit to a warmer
area, make sure to condition it for
about 2 hours at room temperature,
leaving it plugged into AC power.
The positive temperature differen-
tial between the inside of the unit
and the ambient environment
essentially protects the unit against
humidity and moisture.
Open the packaging carefully. It is
a good idea to save the packaging
material (in case the carrier wants
to inspect it or the shipment has
to be returned).
Dispose of packaging materials
in compliance with prevailing
environmental safety regulations.
5.4

Connections

Before starting up the unit; make
sure that the unit is stable and
secure. Check all pneumatic and
electrical connections on the unit.
5.4.1

Front Side and Back Side

1 2 3 4
Fig. 5-2 | Front Panel
The following displays are located
on the front panel:
1 Standby
Is lit up when Sartocheck
ready for operations, but not cur-
rently running any test program.
(Blinking LED)
2 Ready
Lights up when the result of the
filter test is ready. (LED lit)
3 Running
Is lit up when a test is currently
running. (LED lit)
4 Error
Lights up when the test unit has
identified an error and cancelled
the filter integrity test. (LED lit)
Fig. 5-3 | Back Panel
The following connection ports
are located on the back panel:
1 Housing ventilator
®
In the device, there is a ventilator
3 plus is
which ensures a constant tempera-
ture in the Sartocheck
2 Service MU
Only Service function
(software upgrades)
3 AC adapter
Power plug for connecting the
power cord to mains supply.
4 Fuses
Fine-wire fuses between unit
and mains supply.
2
3
1
4
®
3 plus.
13

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis