Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning The Fixture; Software Update; Verifying Electronic Devices - JB-Lighting Sparx 10 Bedienungsanleitung

Scheinwerfer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Zoom & focus:
The zoom effect in all Sparx10 is calibrated at the factory. But if necessary it is possible to fine-
tune the zoom using the ZOOM OFS command.
RECEIVESOFT
Use the RECEIVE SOFT command to prepare the Sparx10 for a software upload. See 6.3 soft-
ware update and the uploader device documentation.
6.2 Cleaning the fixture
WARNING:
!
ATTENTION:
!
To ensure a long and satisfying performance of the fixture, check function of the fans in the
head and in the base from time to time. Most important: make sure that there is no dust or fluff
covering the louvers. To clean the fixture open the head cover and the baseplate. Use a brush
and a vacuum cleaner to remove dust and fluff. Don´t damage or bend any parts. Incompetend
performance of the maintenance will invalidate the warranty claims. Consult qualified service
technicans!

6.3 Software update

To update the fixture via PC/Notebook, a upgrade dongle (USB/DMX converter) with software is
required. The upgrade dongle has to be connected to the fixture with a 5 pin XLR connector. The
software for the products is available from the JB-Lighting homepage at www.jb-lighting.de.

6.4 Verifying electronic devices

In accordance with the applicable German safety regulations (Accident Prevention and Insuran-
ce, BGV A2/A3), electrical installation and equipment have to undergo inspection at regular in-
tervals. For this purpose, the fixing screw of the 5-pin DMX socket may serve as measuring point
for the insulation and fault current measurement. This screw is connected to all sheet metal parts
by means of a contact disc.
Disconnect fixture from mains, and allow unit to cool down for at
least 10 minutes! With direct view on the beam source use a welding
goggle of reduction 4-5!
Débranchez l'appareil du secteur et le laissé refroidir au moins 10
minutes! Lors d'un regard direct dans la source lumineuse il est
fortement recommandé de porter une lunettes de soudeur équipée
de verres à vision atténué degré 4-5!!
PE - measurement point
1 0
- 57 -

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis