Herunterladen Inhalt Inhalt Diese Seite drucken

Final Assembly - Conrad GX106 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für GX106:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

18. Final Assembly

Before final assembly, first get familiar with all functions and try out the device in all
applications you want to install.
To install the GSM aerial, remove the protective foil from the GSM aerial. Glue the aerial to the
assembly site you have already tested for good, interference-free reception as described in
chapter "Configuration of the SIM-Card". Place and attach the aerial cable to the place where
the GSM module is to be installed (e.g. with cable ties).
Install the empty GSM module casing with suitable screws (not included in the delivery) to the
holes already present (where the lid is screwed on).
Attention!
Before drilling, make sure that there are no building installations at the drill sites.
Damage to gas, electricity, water and wastewater pipes may lead to mortal danger or
property damage!
Do not install the device right next to radiators or devices that may cause interferences (e.g.
motors, switching cabinets, etc.). Outdoor installation must be performed at a site protected
from splashing water and protected from solar irradiation all day
Break the required holes for the cable infeed for operating voltage, sensors and devices to be
connected to the GSM module out of the side of the casing.
Install the GSM module PCB in the casing and attach all cables of the operating voltage,
sensors and devices to be connected to the GSM module. Observe the required connection
polarity and firm seat of the cables.
Now install the cables for the supply voltage and the cables of the devices or sensors to be
connected to the GSM module. The connection cables are guided through the closing plugs.
The closing plugs are then installed in the casing.
Place the cables with suitable cable ties or cable clamps (not included in the delivery) to
prevent inadvertent pulling out from the connection casing.
After installation of all cables, you can take the GSM module into operation and try out all
functions. If everything works correctly, close the casing with the lid.
Observe suitable cable cross-sections and a cable type that matches the application
case (in particular if the mains voltage (230 V/AC) is to be switched).
The module may only be commissioned after it has been installed contact-free in a
casing. Prior to commissioning the module group, check whether it is suited for the
intended application!
In case of doubt, you must contact an expert or the manufacturer!
91

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis