Step :6
First slide the X-axis left and right 3 to 5 times, then
align the left guide rail of the Y-axis with the right
guide rail, and then tighten the connecting screws.
After the X-axis is leveled, please ensure that the
synchronizing wheels at both ends are 4-5mm"
away from the Y left/Y right slide rail.
Step :7
Lock the tank chain to bracket with 2 pcs M3*8 screws,Collect the data connection cable into the large clamp and fasten it. Collect the air pipe
into the small clamp and fasten it.
(Buckle big card cable, buckle small card gas pipe.)
trachea
12
Move the X axis forward
and back 3-5 times,
(M3*8)