Herunterladen Inhalt Inhalt Diese Seite drucken

PeakTech 2180 Bedienungsanleitung Seite 70

Dmm/lcr-meter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.3. Replacing the fuse
WARNING! To avoid electric shock disconnect the test leads
before removing the battery or the fuse. Replace only with the
same type of battery or fuse. Service should be performed only
by qualified personnel.
Caution! For continued protection against fire or other hazard,
replace only with a fuse of the specified voltage and current
ratings.
0,8 A / 1000 V FF (Very Fast Acting); 6,3 x 32 mm
Follow these steps to replace the fuse:
1. Turn off the meter an disconnect the test leads.
2. Remove the 6 case screws and remove the back case
cover.
3. Remove defective fuse and replace it with a new one with
the correct specified voltage and current ratings.
4. Replace the back case cover and secure it with the case
screws.
-69-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis