CHAP 6.
TRANSPORT AND HANDLING

6.1 Handling and moving the packaging

The lift is usually shipped as shown in the figure.
-
The lifting operations must be carried out as shown in the figure.
-
Carefully lift the units and transfer them to the site where they are to be unpacked.

6.2 Unpacking and pre-installation

When transferring the lift to the selected installation point (or when repositioning it at a later date), make sure to:
-
Lift it carefully, using suitable load bearing equipment, ensuring it is in good working order, and coupling it to the 
designated lifting points (see figure).
-
Avoid sudden jolts and jerks, and allow for any ramps, bumps, holes, etc.
-
Pay the utmost attention to protruding parts: obstacles, difficult passages, etc.
-
Wear suitable clothing and personal protective equipment.
-
After removing the various parts of the packaging, store them in designated areas where they are inaccessible to 
children and animals until they can be disposed of.
-
Upon taking delivery, check the packaging for damage and, after unpacking the equipment, check that there are 
no damaged parts.
97
0579-M2300-0
Rev.n.0 (09/2025)
INDICE
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vsg rav.535 .196194 serieVsg rav.535 .196217 serieVsg rav.535 .196224 serieVsg rav.518nl.196026Vsg rav.518nl.196040Vsg rav.518nl.196033 ... Alle anzeigen

Inhaltsverzeichnis