Annex: Start up after winterisation procedure
Annex
Start up after winterisation procedure
Risk of electric shock and injury due to moving parts .
Working with the power supply switched on can result in serious injury . Ensure you follow the
personnel requirements outlined in the section titled Safety .
Before performing the start-up procedure, make sure the unit is switched off and the heat
pump is isolated from the mains power supply .
As the heat pump contains electrical and moving parts, it is strongly recommended that only
a competent person carries out the start-up procedure for your safety .
Heat Pump Start-Up Procedure After Winterisation:
1 . Ensure all covers are properly fitted .
2 . Remove the front grille and clean the heat pump's finned surfaces with a soft brush . Re-
place the front grille afterward .
3 . Remove the plastic bags from the inlet and outlet water connections, and reconnect the
pool water pipework to and from the heat pump .
4 . Start the water circulation pump and allow it to run for at least 15 minutes to establish
proper water flow and expel any air from the system .
5 . Replace the external fuses in the heat pump mains supply .
6 . Switch on the heat pump .
7 . Verify that the set point temperature on the control panel is correct and adjust as neces-
sary .
8 . Check daily to ensure the pool water has the correct pH and chemical balance, as outlined
in the table in the section titled Warranty terms and conditions .
DANGER
43