Accessories: Initial checks
Installation
Initial checks
NOTICE
Ensure the following checks are completed and procedures followed before operating the
heat pump .
Pre-Operation Checklist for the Heat Pump:
1 . Power Isolation: Double-check that the mains power supply is isolated before inspecting
the heat pump wiring .
2 . Electrical Wiring: Ensure the electrical wiring conforms to the wiring diagram, and the
heat pump is properly grounded .
3 . Ventilation: Verify that the fan, air inlet, and outlet are unobstructed .
4 . Water Flow: Ensure that pool water is flowing through the heat pump before turning it on .
Always turn on the pool circulation/filter pump before starting the heat pump, and turn off
the heat pump before shutting down the circulation/filter pump .
5 . Water Leaks: Check for any water leaks before powering on the heat pump .
6 . Power-Up Sequence: Once connected to the mains supply and switched on, the control
panel will display various firmware codes . This is normal, and the heat pump will return to a
locked status once the startup cycle completes .
7 . Temperature Settings: To avoid overheating or overcooling the pool water, check the set
temperature on the control panel and adjust if necessary .
8 . Time Delays: The heat pump includes built-in time delays to protect components:
• The fan will run for 1 minute before the compressor starts .
• After the heating or cooling process stops, or when the heat pump is turned off, the fan
will continue running for 1 minute .
9 . Monitoring: After turning on the heat pump, or when heating/cooling begins, check for
any protection or error codes on the control panel and listen for abnormal noises .
10 . Remote Control Panel Test: If a remote control panel is installed, perform the following
test to verify correct operation:
• Set the temperature on the remote panel to 2°C above the current pool water tempera-
ture .
• If pump synchronization is not active, the heat pump should start heating immediately .
• If pump synchronization is active, heating will begin during the next sampling period .