Herunterladen Diese Seite drucken

Bergstrom INTEGRAL POWER II Montageanweisungen Seite 30

Vorschau ausblenden Andere Handbücher für INTEGRAL POWER II:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
INTEGRAL POWER II
EN
Important: Due to the unit's complex
4
electronic system, the power connection must
be made directly to the vehicle's battery.
Important: Check the User Manual before
starting up.
Connection to alternator cable for unit operation with
Caution: The cable will be installed in all
!
vehicles for the unit to work with the engine
started up.
Position excitation cable on the inside or
1
outside of the vehicle as appropriate, and
secure the front with the supplied self-tapping
screws. Connect switches as shown.
Air speed
switch
8
+
the engine running
On the inside
-
1
A/C switch
30
On the outside

Werbung

loading

Diese Anleitung auch für:

1003714495