Herunterladen Diese Seite drucken

Bergstrom INTEGRAL POWER II Montageanweisungen Seite 20

Vorschau ausblenden Andere Handbücher für INTEGRAL POWER II:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
INTEGRAL POWER II
EN
Warning
!
Any modification to ROPS/FOPS, such as welding or
drilling holes in the structural members for mounting
brackets, will affect the ROPS/FOPS capability to provide
the required protection. Installing this product may affect
ROPS/FOPS systems.
Contact your authorized dealer to check compatibility
before making any modifications or repairs. Failure
to do so may void the ROPS/FOPS certification. The
manufacturer of the roof air conditioner assumes no
liability whatsoever.
Take down the hatch cover and the
1
attachment elements, and hand them over to
the customer (*).
*
Remove any excess from the roof before
2
attaching the EPDM seal.
2
1
*
2
20

Werbung

loading

Diese Anleitung auch für:

1003714495