NOTES
- When dipswitch 1 is set to OFF, the electrical consumption of the
hot tub is limited to 16A; in these conditions, when you activate the
hydromassage pump, the electrical heater switches off).
- When dipswitch 1 is set to ON, the maximum electrical consump-
tion is selected.
Check of operation
First start-up
Check that the filter cartridge is present in its container and
that the various components are properly installed.
A
Check that the drainage valve (V) on the base is closed.
Jacuzzi Europe S.p.A. © 2023
ON
1
2
3
4
5
6
7
8
A
31
Note: A valve can also be installed near the drain pit and used in-
stead of the valve (V) (always leave it open); this means you do not
have to remove the panel on the technical compartment every time
(please see the pre-installation information).
Check that all the hydromassage intakes are open.
Fill the hot tub until the water starts to overflow into the bal-
ance tanks.
Filling will be performed as decided beforehand by the customer
(see pre-installation sheet, "Preparation for installation" chapter).
If you use the hose for garden work, let water run for a while
before filling the hot tub. This will eliminate stagnant water in
the hose along with any bacteria that may cause irritations.
NOTE: if the water is particularly hard (i.e. it contains
significant quantities of calcium, magnesium, metals,
etc.), we recommend half-filling the hot tub with hard
water and half-filling it with softened water. Using
only softened water may cause the metal parts to cor-
rode and may damage the hot tub shell.
CAUTION: the hot tub solenoid valve is used to top up
the level in the balance tanks.
Do not use the solenoid valve to fill the hot tub.
V