Herunterladen Diese Seite drucken

ECOLAB TurboPUMP Bedienungsanleitung Seite 22

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.5
Connection of the suction and pressure line
Ensure that the required seal is achieved by mounting O-rings on the connections (Pos. 5)
CAUTION
when connecting the suction and pressure line.
5.6
Electrical Connection
Create an electrical connection according to VDE regulations and guidelines from the local
electricity supply company. A suitable mains plug or pump control system must be installed by
the trained electrician.
417101113_TurboPUMP
 Cut hose (Pos. 1) straight
 Push union nut (Pos. 2) and tensioning piece (Pos. 3) over
hose and insert hose up to the stop collar on the tapered part
(Pos. 4)
 Lay O-ring (Pos. 5) in the valve groove and tighten union nut.
Pos.
Designation
1
Dosing line
2
Union nut
3
Tensioning piece
4
Tapered part
5
Precision O-ring (12 dia. x 2.5 mm)
Pressure valve complete
6
PP valve with EPDM seal
PVDF valve with FPM seal
Suction valve complete
7
PP valve with EPDM seal
PVDF valve with FPM seal
Installing the dosing valve in the correct position:
Fig. 5.7
During installation ensure that the valves are installed correctly
in the direction of flow!
Fig. 5.6
- 22 -
article no. (EBS no.)
1070
107010
(50 l/h)
on request
on request
The direction of flow is marked by
means of an impressed arrow on
the suction/pressure valves.
107020
107030
(20 l/h)
on request
34500133 (on request)
38610409 (on request)
38610408 (on request)
on request
249493 (10001658)
249494 (10099740)
249473 (10001659)
249474 (10005334)
Rev. 7-11.12

Werbung

loading