Herunterladen Diese Seite drucken

Steinbach Highline Bedienungsanleitung Seite 29

Stahlwandpool

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Fig. 26Fig
MOUNTING THE HORIZONTAL PROFILES (HOR 1,2,3)
a) Install the HOR 1 top profiles (straight cut) at the top of the central columns, photos 20 and 21, and align the extremes on the top plate, fig. 28.
Set up the screws and bolt them without pressing on. The 550x366 pools are not equipped with a HOR1 profile, so you must start with the
HOR2 profile (section b).
b) Align all the top HOR2 profiles on the top of the vertical supports and on the top of the T2 panel, photos 22 and 23. Align the holes on them and
screw the screws without tightening.
c) Adjust the upper profiles until they are set up together, but without placing one over the other. Press in all screws, photo 23.
Photo 20
Fig. 28.
Important: If one of the vertical supports (VER) is not straight in relation to the fluted wall, adjust the vertical support with light hammer blows on a
piece of wood on the foundation plate (T1). If the top of the vertical support is not levelled, this must also be readjusted.
ASSEMBLY OF THE TOP HUB CAP (EMB y EMBR)
Level a border (EMB) in the curve at the ends of two upper profiles. Hook the border under the inner edges of two upper profiles, photo 23 and
pull it towards you, photo 24, then hook the border to the outer part, photo 25. Repeat the process with the other borders.
Level a border (EMBR) in the straight part, hook the border under the inner edges of top profiles and pull it towards you, then hook the border to
the outer part.
Photo 23
012620_012622_012624_012621_012623_012625_v_2110
012620_012622_012624_012621_012623_012625_v_2110
Photo 21
Photo 22
Photo 24
. 27
Photo 23
Photo 25
en
EN
de
061205_v1911
061205_v191 1
DE
13
29

Werbung

loading

Diese Anleitung auch für:

012620012622012624Highline oval