ASSEMBLING THE LOWER ARCHED METAL GUIDES PCM
The T1 panel is directly adjacent to the transition guides A, to which the lower arched guide (PCM) connects and runs until the semicircle is closed,
photo 3. The transition guides A must run into the T1 panel, photos 4, 5, leaving a space between the profiles.
Photo 1
MODULE INSTALLATION
After the assembly of the base is complete, make sure that the sides are straight. Make sure that the dimensions are correct by determining the
distance from the first module outside of the straight part to the outside of the other module.
These measurements must be taken from the lower module parts. This ensures a higher measurement accuracy.
It is extremely important that A=B and C=D, Fig. 17. If the readings are not the same, do not proceed with the assembly, otherwise further problems
may arise during the assembly.
BASE PLATE ASSEMBLY
Set up a 122 cm base plate (1) in each module. These plates must be mounted with the grooved side up and the flat side down. These plates have
two holes on one side and you must ensure that these are aligned in the direction of the centre column, Fig. 18.
The holes on the base plate must correspond to the holes on the U-profile. Then they must be fixed in between with screws (9).
The outline of a module is drawn on the ground with spray paint, lime or a powder. Once this is done, the module is moved to one side and the soil
underneath is removed with a shovel (video: https://www.youtube.com/watch?v=508QF1Pdulk). The hole depth must be about 5 cm, Fig. 18, and
completely level. After the hole has been machined and levelled, the module is inserted, using a spirit level on the top of the module, fig. 19, to
ensure that it is properly level.
This procedure must be repeated on each module side of the pool. The measuring tape must be used to check the readings again, as this ensures
that the modules have not shifted during the process (and are still exactly in position), Fig. 18.
Then the base plate is set up under each module on the back of the module, Fig. 20. To do this, the module is tilted and the earth under the plate is
levelled. After installing the plate, check the module flatness again and take the measurement again, fig. 19.
012620_012622_012624_012621_012623_012625_v_2110
012620_012622_012624_012621_012623_012625_v_2110
Photo 2
061205_v1911
061205_v191 1
Photo 3
Fig. 18.
en
EN
de
DE
8
24

Werbung

loading

Diese Anleitung auch für:

012620012622012624Highline oval