Herunterladen Diese Seite drucken

Steinbach Highline Bedienungsanleitung Seite 28

Stahlwandpool

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Photo 10
INSTALLATION OF THE UPPER PROTECTIVE SECTION (PL)
e)
When installing the protection profile (PL), Fig. 24., remove all the clamping brackets located above the casing and along the perimeter of the pool.
f)
Mark and cut off the overhang on the intermediate construction, photos 15 and 16.
g)
Photo 14
INSTALLATION OF THE UPPER SECTION (PBS)
Important: If your pool has a decorative trim, set it up using the decoration manual before installing the top PBS profiles.
h)
Adjust the top section (PBS) on the top of the protection section (PL) around the entire pool perimeter, photo 17.
i)
Mark and cut off the overhang on the intermediate structure, photos 18 and 19. To prevent the pool walls from falling inwards, align the top panel
(5) on the central supports (1).
Photo 17
ASSEMBLY OF THE VERTICAL SECTIONS (VER)
Align the lower part of one of the vertical sections (VER) (1) with the two small tabs on the foundation plates (T1) (2). The tabs must be on the
a.
inside of the vertical section, Fig. 26.
Align the holes for the orientation screws TO2 (3) on both sides of the vertical section and make sure they line up with the holes in the T1 (2)
b.
plate tabs, Fig. 26.
Set up the top section (T2) (4) at the top edge of the pool and on a vertical support (VER), with the tabs on the inside of the section, Fig. 27.
c.
Match the holes for the orientation screws TO2 (6), fig. 27, in the three holes of the vertical section and make sure they fit into the T2 (6) lug
d.
holes.
Repeat steps a-d for the other pool sections.
e.
Photo 11
Photo 15
Photo 18
012620_012622_012624_012621_012623_012625_v_2110
012620_012622_012624_012621_012623_012625_v_2110
Photo 13
Photo 12
Photo 16
Photo 19
en
EN
de
061205_v1911
061205_v191 1
DE
12
28

Werbung

loading

Diese Anleitung auch für:

012620012622012624Highline oval