Herunterladen Diese Seite drucken

Steinbach Highline Bedienungsanleitung Seite 26

Stahlwandpool

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Very important: Fit all screws in the steel wall, starting from the bottom upwards to the top end of the wall, leaving the first hole on the topmost side
without screws. Press all screws with a screwdriver and the nuts with a spanner. If the installation and the fastening of the screws and nuts are not
carried out correctly or are incomplete, the warranty for the pool will be invalidated.
e)
Attach the PVC support so that the screw heads are covered (inside the pool), as this protects the casing from friction with the screws, Fig. 23.
In this area the support must be firmly clamped and use tape or something similar to tack it to the steel wall if necessary.
correct dimension of the pool with a measuring device.
Fig. 23.
stones) or use it in the inner area of the pool with a thickness of 5 cm.
Make sure that all metal parts of the pool that could damage the boarding
are protected, otherwise the warranty will be void. Level the sand layer with a rake. You can also
use our optionally available polystyrene wedges. These are glued to the round bottom insulation
along the pool wall with adhesive force.
VERY IMPORTANT: To protect the perimeter inside the pool, use pure sand (no stones or other objects)
and form a triangular wedge (height 20 cm, base 20 cm). Like this
damage to the formwork due to water pressure is avoided. At the same time, the formwork cannot slip under the steel wall, which is helpful with
regard to the correct distribution of forces. It is very important that no thin, grainy or beach sand, photo 24, is used for this purpose. Failure to apply
this sand wedge will invalidate the guarantee.
WALL COVERING
Before installing the decking, it is recommended that the entire interior of the pool, including the sand wedge tops, cover the wall TOI or install
artificial grass.
CORRECT SHUTTERING ASSEMBLY
To install the casing correctly, it must be perfectly centred and in line with the pool's foundation. It is essential that there are as few folds as possible.
1.- The central weld visible on the casing foundation must be located so that its ends
match the metal plates connecting the lower pool guides. This central weld must be fully
centred.
2 - In both "A-A" bends, Fig.25, the distance from the formwork to the steel wall must be
the same, as this allows the formwork to be adjusted equally in both bends.
Photo 5
Before installing the formwork, check that the guides form a geometric curve. Before placing the formwork, check the
a)
f) Before installing the casing, apply a layer of thinly sifted grit (no
012620_012622_012624_012621_012623_012625_v_2110
012620_012622_012624_012621_012623_012625_v_2110
Fig. 22
Fig. 24.
en
EN
de
061205_v1911
061205_v191 1
DE
10
26

Werbung

loading

Diese Anleitung auch für:

012620012622012624Highline oval