Herunterladen Diese Seite drucken

Helios AIR1 XVP 850 Montage- Und Betriebsvorschrift Seite 78

Zentral-lüftungsgeräte

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Operating Instructions
EN
Central ventilation units AIR1 XVP
2. Attach the pipe bracket (see Fig.7).
3. Fix the pipe bend below the condensation tray. Ensure that the construction is water-tight by turning the pipe con-
nector (see Fig.8).
4. Unlock and open the doors with the key included in the scope of delivery (see Fig.9).
5. Remove the condensate cap with a screwdriver (see Fig.10).
8
Fig10
Fig7
Fig8
Fig9

Werbung

loading