Herunterladen Inhalt Inhalt Diese Seite drucken

GOK BHK 052 OPSO Montage- Und Bedienungsanleitung Seite 24

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Behälterregler-Kombination PS 25 bar
Risk of injuries due to blown-out metal chips!
Metal chips may cause eye injuries.
Wear safety goggles!
Assembly notes
Malfunctions caused by residues! Proper functioning is not guaranteed.
• Visually check that there are no metal chips or other residues in the connections!
• It is important that metal chips or other residues are blown out!
Install with suitable tools, if required.
Regarding screw connections, use a second spanner to brace against the connection
nozzle. Do not use unsuitable tools, such as pliers.
Product damaged through incorrect installation direction
Proper functioning is not guaranteed.
• Observe the installation direction (marked on the product with an arrow
).
To install the connections, see CONNECTIONS in the assembly manual.
During installation make sure that the withdrawal valve and the piping are aligned.
Do not install the tank regulator under tension.
We recommend the "regulator support for CE tanks", Part no. 02 510 40.
For installation on an underground gas tank with long welding sleeve, use the regulator
support for CE tanks (Part No. 02 510 40).
• Suitable for all GOK tank regulators.
• Suitable for retrofitting.
To install the connections, see CONNECTIONS in the assembly manual.
For installation in a dome shaft, we recommend:
Installation of ventilation set (Part No. 02 063 08 and 02 063 10).
• Prevents water getting into the pressure regulator.
For outdoor applications, the product must be located or protected so that no dripping
water can enter. We recommend installation in under a hood or in a gas pressure regulator
box, respectively, or in a housing
The installation steps are described using a pressure regulator with US POL
connection as an example (British POL connection and POL connection soft)
1. Apply a drop of oil to the conical sealing surface of the POL connector.
2. Screw the POL connection on to the withdrawal valve of the gas cylinder hand-tight.
3. Tighten the piping on the outlet nozzle while bracing against the flat of the pipe coupling.
4. Tighten the POL connector on the withdrawal valve.
24 / 182
Artikel-Nr. 05 288 50 m

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bhk 052 upsoBhk 052bBhk/k

Inhaltsverzeichnis