Herunterladen Inhalt Inhalt Diese Seite drucken

Optimum OPTigrind GB 100S Betriebsanleitung Seite 29

Bandschleifer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The following points should be noted:
The device must only be installed and operated in a dry and well-ventilated place.
The work table must be suitable for the belt grinder. If necessary, this table must also be
firmly connected to the subfloor.
Provide enough space for set-up and operating personnel and material transport.
Ensure adequate lighting is available (minimum value: 500 Lux, measured at the tool tip). In
the event of a lower level of lighting, additional illumination must be provided, e.g. by means
of a separate workplace light.
The power plug of the belt grinder must be readily accessible.
CAUTION!
Arrange the machine's connection cable in such a way that it will not cause a tripping
hazard.
3.5.2
Extraction socket
For certain operations, it may be appropriate to connect
the belt grinder to an extraction system or to an industrial
vacuum cleaner. The suction connection at the bottom
and the back of the belt grinder has an outer diameter of
60mm.
Use both extraction ports simultaneously or only one of
the two extraction ports that best suits the purpose of
extraction using the material. The second extraction con-
nection should be blindly closed to maintain the extraction
performance of your extraction system.
The GU2 from Optimum Maschinen Germany GmbH is the ideal extraction unit. This suction
device has 60mm suction hoses, where both suction connections of the belt grinder can be
connected at the same time.
Delivery, interdepartmental transport and unpacking
Version 1.0.2 - 2021-9-30
Translation of original instruction
GB100S
EN
29

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3101660

Inhaltsverzeichnis