Herunterladen Inhalt Inhalt Diese Seite drucken

Srew Anchor Pull-Out Forces - Paramondo LINE Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

54
Screw anchor pull-out forces
Screw anchor pull-out forces
Pull-out forces state the force required for
pulling a screw out of the wall. No difference
is made between the screw plus screw an-
chor coming out of the wall, the screw brea-
king or the brickwork failing.
The pull-out forces state the maximum ten-
sile force that may be exerted on the screw
and/or screw anchor.
The fixing material must be selected to
match the fitting base, type of fitting and
pull-out forces.
The values in the table are stated in kN and
express the pull-out force of the anchor
(screw / screw anchor) which is subjected to
the highest tension.
The values are calculated for an anchor in
unbroken concrete.
The selection of the most suitable fixing ma-
terial depends on the type of fitting base and
its physical condition. The fitter is responsib-
le for checking the fitting base prior to fitting
the awning.
The screw anchor pull-out forces are calcu-
lated on the basis of Wind Resistance Class
1 in accordance with the EN 13561 and EN
1932 standards.
www.paramondo.de
Size
350 cm x 300 cm
400 cm x 300 cm
450 cm x 300 cm
500 cm x 300 cm
600 cm x 300 cm
N/Number of brackets
Wall
Ceiling
1186/2
1766/2
1327/3
1973/3
1495/3
2181/3
1636/3
2391/3
2149/4
3122/4

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis