Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Machine For Operation - Stihl GH 370 S Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für GH 370 S:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Item
Designation
V
Lower spacing ring
W
Protective cap
X
Installation tool
Y
Torx wrench
Z
Combination spanner
Instruction manual
Engine
instruction manual
7. Preparing the machine for
operation
Risk of injury:
Observe the safety instructions in
the section "For your safety" (
● Place the machine on level and firm
ground when performing all the
operations described.
7.1 Installing ejection chute
extension
● Fit ejection chute extension (E)
onto basic unit and install screws (J)
(1 - 2 Nm).
7.2 Installing wheels and chassis
● Attach left and right wheels (G)
with wheel pin (R), washer (L1),
washer (L2) and nut (K1) to
wheel carrier (C).
● Press wheel caps (H) onto wheels.
● Place wheel carrier as shown on firm
and level ground and fit basic unit (B)
into position.
0478 216 9908 A - EN
● Insert flat head bolts (N) on the left side
Qty.
and screw on lock nuts (K2), but do not
1
tighten them yet.
1
Install Torx screw (M) on the right side
1
(1 - 2 Nm).
1
● Tighten nuts (K2) (10 - 12 Nm).
1
1
7.3 Installing the discharge flap
1
● Set garden shredder on its back.
● Insert strip (F) into ejection chute
extension. Install screws (J) (1 - 2 Nm).
● Lift garden shredder into upright
position.
● Position discharge flap (D) on ejection
4.).
chute extension. Ensure that the ribs (1)
inside the flaps on the left and right are
correctly located in the guide groove of
the ejection chute extension (2) when
attaching.
● Press in pins (S) on left and right.
3
7.4 Opening and closing the
discharge flap
Opening the discharge flap:
● For shredding, fold the discharge
flap (D) upwards and allow the tab (1)
to engage in the ejection chute
4
extension.
5
Closing the discharge flap:
● For transport or space-saving storage,
lift the tab (1) slightly and fold away the
discharge flap (D) downwards.
7.5 Installing the blade disc
Observe the installation sequence
and tightening torque of
52 - 60 Nm.
Ensure correct position of upper
spacing ring (U) to both blades
when installing.
6
● Fit protective cap (W), lower spacing
ring (V), blade disc (I), upper spacing
ring (U), deflector (T) and retaining
washer (P) onto the blade mounting
and insert screw (O).
● Use installation tool (X) to counterhold
the blade disc. Screw in screw (O)
using combination spanner (Z) and
tighten to a torque of 52 - 60 Nm.
7.6 Removing the blade disc
● Use installation tool (X) to
counterhold the blade disc.
● Loosen screw (O) with combination
spanner (Z).
7
● Remove screw (O), retaining
washer (P), deflector (T), upper
spacing ring (U) and blade disc (I).
7.7 Installing the feed chute
The closure screws (Q) must be
securely fastened to the feed chute
following initial assembly.
● Insert closure screws (Q) in the slot of
the feed chute and screw in fully,
applying pressure.
● Attach feed chute (A) to hinge (1) in
basic unit and pivot forwards.
8
9
10
37

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis