Herunterladen Inhalt Inhalt Diese Seite drucken

Final Checklist - Hoshizaki KM-590DJE-R452 Bedienungsanleitung

Stapelbarer halbmondeisbereiter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
ENGLISH
H. Final Checklist
CHOKING HAZARD: Ensure all components,
fasteners, and thumbscrews are securely in place
after installation. Make sure that none have fallen
into the storage bin.
1) Is the icemaker level?
2) Is the icemaker in a site where the ambient temperature is
within 7°C to 38°C and the water temperature within 7°C to
32°C all year around?
3) Is there at least 15cm clearance at sides, rear, and top
of the icemaker for proper air circulation and ease of
maintenance and service?
4) Have the shipping carton, tape, and packing material been
removed from the icemaker? Are the cube guides in their
correct positions? See Fig. 9. Are the separators between
the evaporator banks properly attached to their holding
clips?
5) Are all components, fasteners, and thumbscrews securely
in place?
6) Have all electrical and water connections been made? Do
electrical and water connections meet all national, state,
and local code and regulation requirements?
7) Has the power supply voltage been checked or tested
against the nameplate rating? Has a proper ground (earth)
been installed to the icemaker? On remote air-cooled
model, has a proper ground (earth) also been installed to
the remote condenser unit?
8) Are the water supply line shut-off valves and drain valves
installed? Has the water supply pressure been checked to
ensure a minimum of 0.07MPa (0.7 bar) and a maximum
of 0.78MPa (7.8 bar)?
Note: The icemaker may stop running when the water
supply is off, or if the pressure is below 0.07MPa
(0.7 bar). When the proper water pressure is
reached, the icemaker automatically starts running
again.
9) Are the compressor hold-down bolts snug? Have the
refrigerant lines been checked to make sure they do not
rub or touch other lines or surfaces? Have the fan blade(s)
(if applicable) been checked to make sure they turn freely?
10) On remote air-cooled model, is the refrigerant line set
tightened and free of leaks and kinks?
11) Has the end user been given the instruction manual,
and instructed on how to operate the icemaker and the
importance of the recommended periodic maintenance?
Upon completion of startup, this installation manual
should also be given to the end user.
12) Has the end user been given the name and telephone
number of an authorized service agent?
13) Has the warranty card been filled out and forwarded to
the factory for warranty registration?
WARNING
Separators
Fig. 9
11
Cube Guides

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis