Herunterladen Inhalt Inhalt Diese Seite drucken

Sensor Status Display Via Leds - Sartorius BioPAT Xgas Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating Information
5.2.3

Sensor Status Display via LEDs

LED status
Description
green
Sensor is ready for operation
yellow
Warm-up phase, can take
up to 60 minutes
green |
Prompt to perform a 1-point
yellow
calibration
green
1-point calibration running
flashing
green |
Factory calibration required
yellow
flashing
red
Sensor not working
Fig. 7: Buttons with LEDs
30
Operating Instructions BioPAT
Possible Causes
The sensors must reach operat-
ing temperature, otherwise the
measurements are incorrect
Always at the initial startup,
or when the sensor signal shows
extreme changes
Calibration started by pressing
the two buttons for 5 seconds
Strong signal alteration due to
age of the sensor or incorrect
1-point calibration
Sensor currently starting up; sig-
nal too weak; sensor defective
Xgas
®

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis