After cleaning, check all fuel and engine oil lines for leaks, loose connections, abrasions and
I
damage! Repair any noticed faults immediately!
I
During maintenance and repair work always tighten threaded connections to the specified
torque!
If disassembly of safeguards is required when setting up, maintaining and repairing, check for
I
correct assembly and functioning of the safeguards immediately after completion of the work!
Ensure safe and environmentally sound disposal of fuels and auxiliary substances and replace-
I
ment parts!
1.1.4.
Changes to the power generator
I
Only specialists authorised by EISEMANN are permitted to make any changes on the power
generator!
Only a qualified electrician is allowed to work on the electrical equipment of the power genera-
I
tor in accordance with the electrotechnical rules!
1.2.
Special types of hazard
1.2.1.

Electrical energy

H
Check the functional capability of the safety equipment before each start-up!
Use only certified and approved cables for the mains system!
H
Immediately turn off the power generator in the event of faults in its electrical supply!
H
Only a qualified electrician is allowed to work on electrical systems and equipment in accord-
H
ance with the electrotechnical rules!
Check the electrical equipment of the power generator regularly. Immediately repair any de-
H
fects such as loose connections or damaged cables or plant components!
Use only genuine fuses with the specified current!
H
H
De-energize machine components undergoing inspection, maintenance and repair work. Make
sure the disconnected areas are de-energized!
Block off the work area!
H
Use only voltage-insulated tools!
H