Herunterladen Inhalt Inhalt Diese Seite drucken

CLIVET DUCT 2 ID3-XY Serie Handbuch Für Installation, Betrieb Und Wartung Seite 76

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

DRAIN TEST
Check that the drainage pipe is not blocked.
This test must be carried out in new builds before finishing
the ceiling.
Unit without pump.
1 Fill the collection tank with 2 litres of water.
Drainage pipe
2 Check that the drain pipe is not blocked.
26
Unit with pump.
1 Remove the test cap.
2 Fill the collection tank with 2 litres of water.
Fig. 30
3 Switch the unit on in COOLING mode. You will hear
the noise of the drain pump. Check that the water
drains properly (a delay of 1 minutes before discharge
is acceptable, based on the length of the drain pipe)
and check that there are no leaks at the joints.
4 Switch the air conditioner off and put the cap back on.
Test cap
Drainage pipe
Installation
Fig. 31

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Duct 2 id3-xy 27mDuct 2 id3-xy 35mDuct 2 id3-xy 53mDuct 2 id3-xy 70mDuct 2 id3-xy 88mDuct 2 id3-xy 105m ... Alle anzeigen

Inhaltsverzeichnis