Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Positioning/Hanging - FLORABEST FTS 1100 C3 Originalbetriebsanleitung

Schmutzwasser-tauchpumpe
Vorschau ausblenden Andere Handbücher für FTS 1100 C3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
• After erection, the mains plug
must be freely accessible when
the equipment is in operation.
• Before operating your new
pump, have a specialist check:
- The earthing, the protec-
tive multiple earthing; the
residual current circuit break-
ing must be compliant with
the safety regulations of the
energy supply company and
function without fault,
- The protection of the electri-
cal plug connections from the
wet.
- If there is a risk of flooding,
fix the plug connections in an
area that is safe from flood-
ing.
• Ensure that the mains voltage
matches the specifications on
the rating plate.
• The electrical installation shall
be according to national wiring
rules.
• Before each use, check the
equipment, cable and plug for
damage. Defective cables are
not to be repaired, but rather
replaced by new ones. Have
damage on your equipment
repaired by an authorised spe-
cialist.
• If the power cable for this
equipment is damaged, it must
be replaced by the manufac-
turer, a customer service agent
of the same or a similarly quali-
fied person in order to prevent
hazards.
• Do not pull the plug from the
socket by the cable. Protect the
cable from heat, oil and sharp
edges.
• Do not carry or fix the equip-
ment by the cable.
• Use only extension cables that
are protected from spray water
and designed for outdoor use.
Always fully unroll a cable
drum before use. Check the ca-
ble for damage.
• Disconnect the mains plug from
the socket before all work on
the equipment, in case of leaks
in the water system, during
work breaks, and when not in
use.
• The cross-section of mains con-
nection lines must be no smaller
than rubber hose lines with the
designation H07RN8-F. The line
must be 10 m long. The flexible
lead cross-section of the exten-
sion cord must at least
2.5 mm
.
2
• Perform the electrical installa-
tion in accordance with nation-
al regulations.

Initial Operation

Positioning/Hanging

The dimensions of the pump shaft must
be not less than 40 x 40 x 50 cm, in
order that the float switch (
move freely.
The pump can be suspended by the
round handle (
shaft floor.
The pump can be suspended and/or
removed using the nylon cord (
provided.
To hang up safely, loop the nylon cord
around both of the cable holders that
are pointing downwards and pull it up-
wards through the round handle.
GB
IE
7) can
1) or placed on the
11)
23

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis