9
Hardware
O
Bolt (pre-installed)
P
Bolt
1
LCB Communication
2
Extension Power Wire
3
TV Power
4
Console Connect Wires
5
Ethernet
6
Coax
7
Ground Wire
1
2
3
4
5
6
ASSEMBLY COMPLETE
8
Qty
4
2
7
BEFORE YOU BEGIN
LOCATION OF THE UNIT
Place the equipment on a level and stable surface away from direct
sunlight. The intense UV light can cause discoloration on the plastics.
O
Locate the equipment in an area with cool temperatures and low humidity.
Please leave a free area behind the equipment that is at least 0.6 meters
(24 inches). This area must be clear of any obstruction and provide the
P
user a clear exit path from the equipment. Do not place the equipment in
any area that will block any vent or air openings. The equipment should
not be located in a garage, covered patio, near water or outdoors.
LEVELING THE EQUIPMENT
The equipment should be level for optimum use. Once you have
placed the equipment where you intend to use it, raise or lower one
or both of the adjustable levelers located on the bottom of the frame.
Use 6mm hex key through the access hole (shown below).
A carpenter's level is recommended.
NOTE: There are only two levelers on the equipment.
WARNING!
Our equipment is heavy, use care and additional help if necessary when
moving. Failure to follow these instructions could result in injury.
TRAINING AREA
FREE AREA
0.6
m
(2
)
ft