Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Geberit ESG 3 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für ESG 3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN

Operation

Preparing the Geberit electrofusion machine
ESG 3 for serial welding
Prerequisite
• Pipes, fittings and welding joints are dry and free of dirt
• Pipes and fittings are prepared in accordance with the
installation manual for Geberit electrofusion couplings
• Pipe surfaces are prepared in accordance with the installation
manual for Geberit electrofusion tape for anchor point
For serial welding, a maximum of three Geberit electrofusion
couplings or Geberit electrofusion tapes ≤ ø 63 mm may be
connected to one another.
In the case of serial welding of parts with different
dimensions, please refer to the table on the rear cover page
for the maximum number of parts that may be used.
34
B1157-002 © 01-2015
966.475.00.0 (01)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis