Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Pneumatic System - Abicor Binzel BRS-FP Betriebsanleitung

Brennerreinigungsstation
Vorschau ausblenden Andere Handbücher für BRS-FP:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BRS-FP/BRS-FPi

6.3 Connecting the pneumatic system

NOTICE
• These operating instructions describe multiple variations.
• Observe the provided pneumatic plan and optional connections.
A compressed air hose with an outer diameter of Ø 10 mm (inner width of Ø 8 mm) is required for the supply line.
A shut-off valve in the supply line is recommended. This allows the BRS-FP/BRS-FPi to be quickly and simply depressurized
in order to carry out any installation and maintenance work.
 13.1 Pneumatic plan on page EN-26
6.4 Cleaning station sub-assembly
1
12
1
PCB
2
Clamping jaw
3
Replaceable reamer holder
4
Torch-specific reamer
5
Covering hood
Fig. 5
Cleaning unit
NOTICE
• Also program during the cleaning process: "Air blast through cable assembly" so that the loosened dirt is blown out
from the inside.
BAL.0028.0 • 2021-01-19
2
11
10
9
6
Inductive proximity switch (stroke down)
7
Aluminum cast housing with integrated lift
cylinder and connection plate for valve
mounting
8
Pneumatic motor
3
4
8
9
Guide block with motor bracket,
stroke 50 mm
10 Screw connection for control lead
11 Solenoid valve for clamping device
(clamp/release) and motor (on/off)
12 Solenoid valve for reamer stroke
(bottom/top)
6 Commissioning
5
6
7
EN - 13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Brs-fpi

Inhaltsverzeichnis