Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Delivery; Transport - Abicor Binzel BRS-FP Betriebsanleitung

Brennerreinigungsstation
Vorschau ausblenden Andere Handbücher für BRS-FP:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BRS-FP/BRS-FPi

4 Scope of delivery

• BRS-FP/BRS-FPi torch cleaning station
Tab. 9
Scope of delivery
• Set of clamping jaws
Tab. 10
Accessories
• Assembly stand
• Wire cutter (DAV)
• Maintenance unit
Tab. 11
Options
A set of clamping jaws and a reamer are required for the initial setup and the proper functioning of the torch cleaning station.
These depend on the torch and gas nozzle geometry.
Order the equipment parts and wear parts separately.
The order data and ID numbers for the equipment parts and wear parts can be found in the current product catalog.
Contact details for advice and orders can be found online at www.binzel-abicor.com.

4.1 Transport

Although the items delivered are carefully checked and packaged, it is not possible to fully rule out the risk of transport
damage.
Goods-in inspection
In case of complaints
Packaging for returns Where possible, use the original packaging and the original packaging material. If you have
Tab. 12
Transport
4.2 Storage
Physical storage conditions in a closed environment:
 Tab. 2 Ambient conditions for transport and storage on page EN-6
BAL.0028.0 • 2021-01-19
Use the delivery note to check that everything has been delivered.
Check the delivery for damage (visual inspection).
If the delivery has been damaged during transport, contact the last carrier immediately.
Retain the packaging for potential inspection by the carrier.
any questions concerning the packaging and/or how to secure an item during shipment,
please consult your supplier.
• Operating instructions
• Reamer
• Anti-spatter injector
• Solenoid valve (24 V)
4 Scope of delivery
EN - 9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Brs-fpi

Inhaltsverzeichnis