Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Device On The Foundation; Electrical Connection; Power Supply - Mennekes Amedio Professional+ Serie Betriebs Und Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

5.3.7 Installing the device on the foundation

1
2
3
4
Fig. 13: Installing the device
f Check that the threaded rods are straight and undam-
aged.
f Place the device on the base plate (4) and route the
supply line, the data line (if applicable) and the founda-
tion earth electrode from below through the opening in
the device.
f Attach the device to the threaded rods (3) with the
washers (2) and nuts (1).
f Tighten the nuts. Tightening torque: 90 Nm

5.4 Electrical connection

5.4.1 Power supply

The device can be connected in a TN /TT network. The
device can only be connected in an IT network under the
following conditions:
„ Connection to a 230 / 400 V IT network is not permit-
ted.
„ Connection to an IT network with 230 V external line
voltage over a residual current circuit breaker is per-
missible, provided that the maximum contact voltage
does not exceed 50 V AC when the first error occurs.
L1
L1
Fig. 14: Power supply connection (example: single-phase
operation)
f Strip the supply line.
f Strip conductors 12 to 18 mm.
f Connect the supply cable to the terminals as per the
terminal labelling.
Several devices can be connected in series (loop
through supply cable).
f Comply with the connection data of the terminals.
Î "4 Technical data"
When routing the supply line, comply with the
permissible bending radius.
L2
L3 N
PE
EN
15

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Amedio professional+ 22Amedio professional+ 22 t2sAmedio professional+ pnc 22Amedio professional+ pnc 22 t2s

Inhaltsverzeichnis