Herunterladen Inhalt Inhalt Diese Seite drucken

Mennekes Amedio Professional+ Serie Betriebs Und Installationsanleitung Seite 62

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
f Use a slotted screwdriver for removing jumpers (except
for the jumper at terminals N).
f Connect a jumper between the L1 and L2 terminals.
f Check that the jumper is tightly fitted and can only be
removed by using a tool.
Position of jumpers for single-phase operation:
L1
L2
L3 N
Fig. 18: Position of jumpers for single-phase operation
Only two jumpers are required for single-phase
operation.
Position of jumpers for three-phase operation (condition at
the time of delivery):
L1
L2
L3 N
Fig. 19: Position of jumpers for three-phase operation (con-
dition at the time of delivery)
18
Web interface
To operate the device on a single phase, it is necessary to
change two parameters in the master web interface and in
the slave web interface.
Î "6 Commissioning"
Configuration of the following parameters in the
"Operator" menu is required for single-phase or three-
phase operation.
PE
Single-phase operation:
Parameter
Phases con-
nected to the
ChargePoint
Phase rotation of
the ChargePoint
Three-phase operation:
Parameter
Phases con-
nected to the
ChargePoint
PE
Phase rotation of
the ChargePoint
Setting master
Setting slave
web interface
web interface
Single-phase system
RST (L1/L2/L3, Standard Reference
Phasing)
Setting master
Setting slave
web interface
web interface
Three-phase system
RST (L1/L2/L3,
STR (L2/L3/L1,
Standard
Standard 120
Reference
degree rotation)
Phasing)

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Amedio professional+ 22Amedio professional+ 22 t2sAmedio professional+ pnc 22Amedio professional+ pnc 22 t2s

Inhaltsverzeichnis