INSTALLATION

Preparation

Pipe assembly for DHB water plug-in couplings
Use the water plug-in couplings if the existing installation contains
water plug-in connections from a DHB water heater.
Load shedding relay (LR 1-A)
The load shedding relay for installation in the distribution board
provides priority control for the instantaneous water heater when
other appliances, such as electric storage heaters, are being op-
erated simultaneously.
Central thermostatic valve (ZTA 3/4)
Use the thermostatic valve for central premixing when, for ex-
ample, operating an instantaneous water heater with preheated
water. For use in shower operation, the valve must be set to a
maximum of 55 °C.
9.
Preparation
9.1

Installation location

Material losses
!
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically and near the draw-off
f
point. For horizontal installation, see chapter "Alternative in-
stallation methods / Horizontal installation of the appliance".
The appliance is suitable for undersink and oversink installation.
Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
Note
f Mount the appliance on the wall. The wall must have
f
sufficient load bearing capacity.
www.stiebel-eltron.com
1
2
1
9.2

Minimum clearances

≥50
f Maintain the minimum clearances to ensure trouble-free op-
f
eration of the appliance and facilitate maintenance work.
9.3

Water installation

f Flush the water line thoroughly.
f
Taps/valves
Use appropriate pressure taps. Open vented taps are not per-
missible.
Note
Never use the 3-way ball shut-off valve in the cold water
inlet to reduce the flow rate. The 3-way ball shut-off valve
is intended only to shut off the cold water inlet.
Permissible water line materials
- Cold water inlet line:
Pipes made from galvanised steel, stainless steel, copper or
plastic
- DHW outlet line:
Pipes made from stainless steel, copper or plastic
Material losses
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum per-
missible pressure.
Flow rate
f Ensure that the flow rate for switching on the appliance is
f
achieved.
f Increase the water line pressure if the required flow rate
f
is not achieved when the draw-off valve is fully open. If
the flow rate is still not achieved, remove the flow limiter
(see chapter "Installation / Installation / Removing the flow
limiter").
≥50
DHB-E LCD |
31