Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Safety; General Safety Instructions; Instructions, Standards And Regulations; Information On The Safety Valve - STIEBEL ELTRON ESH 10 U-P Plus Bedienung Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION
Safety
INSTALLATION
6.
Safety
Only a qualified contractor should carry out installation, commis-
sioning, maintenance and repair of the appliance.
6.1

General safety instructions

We guarantee trouble-free function and operational reliability only
if original accessories and spare parts intended for the appliance
are used.
6.2

Instructions, standards and regulations

Note
Observe all applicable national and regional regulations
and instructions.
6.3

Information on the safety valve

Material losses
!
Never exceed the operating pressure.
Material losses
!
Route the drain pipe of the safety valve with a slope and
leave it open to the atmosphere.
Material losses
!
The safety equipment requires regular maintenance
and activation (see installation instructions of the safety
valve).
7.

Appliance description

The appliance is intended for heating cold water and to supply
one or more draw-off points.
ESH 10 U-P Plus
The sealed unvented (pressurised) appliance is only suitable for
undersink installation.
ESH 10 O-P Plus
The sealed unvented (pressurised) appliance is only suitable for
oversink installation.
The appliance may only be installed with pressure taps and in
conjunction with the type-tested diaphragm safety valve with
non-return valve (see chapter "Installation / Appliance descrip-
tion / Standard delivery").
The enamelled steel inner cylinder is equipped with a protective
anode. The protective anode protects the inner cylinder against
corrosion.
www.stiebel-eltron.com
7.1

Standard delivery

The following are delivered with the appliance:
- Wall mounting bracket
- Diaphragm safety valve with non-return valve
8.

Preparation

Water installation
A diaphragm safety valve with non-return valve is required.
Taps
Only install pressure taps in conjunction with the diaphragm safety
valve.
8.1

Installation site

Material losses
!
Install the appliance in a room free from the risk of frost.
Material losses
!
Mount the appliance on the wall. The wall must have
sufficient load bearing capacity.
Always install the appliance vertically and near the draw-off point.
8.1.1 ESH 10 U-P Plus - undersink installation
Note
The appliance is only suitable for undersink installation.
The water connections of the appliance are at the top.
ESH 10 U-P Plus | ESH 10 O-P Plus |
15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Esh 10 o-p plus

Inhaltsverzeichnis