Herunterladen Inhalt Inhalt Diese Seite drucken

SCHUNK PPU-E Serie Montage- Und Betriebsanleitung Seite 75

Elektrische pick and place-einheit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.1.1 Mechanical connection of the PPU-E 15 module ................................... 97
6.1.2 Mechanical connection of the PPU-E 30 module ................................... 98
6.2
Mechanical connection of basic interface (A02) ..............................................  100
6.3
6.4
Mechanical connection C-axis interface (C04...C12, E04...E12) .......................  102
6.5
Electrical connection ........................................................................................  103
6.5.1 PE ground ............................................................................................. 104
6.5.2 Connections on the back panel ............................................................ 105
6.5.5 incremental measuring system LE200 .................................................. 108
6.5.6 Absolute measuring system TTK70 / TTK70S........................................ 109
6.5.7 MSA111C absolute measuring system ................................................. 110
6.5.8 Incremental measuring system Encoder Kit R ...................................... 111
6.5.9 Absolute measuring system SKM36S.................................................... 112
6.5.10 Motor.................................................................................................... 113
6.5.11 I/O interface for critical load ................................................................ 114
6.5.13 I/O Interface for C-axis (C04...C12, E04...E12) ...................................... 116
6.5.14 I/O interface for Venturi nozzles (VAF)................................................. 117
6.5.15 Sensor input plug 3-pin and 4-pin ........................................................ 118
6.6
Pneumatic connection / pneumatic diagrams..................................................  120
(PF4), 2x6 (PF6) .................................................................................... 121
6.6.2 Pneumatic diagram for C-axis version .................................................. 122
6.6.3 Pneumatic diagram for Venturi nozzle version .................................... 123
6.6.4 Pneumatic diagram for vacuum pump version .................................... 124
6.6.5 Optional holding brake ......................................................................... 125
7
Servicing ............................................................................................................... 126
8
Maintenance ........................................................................................................ 128
8.1
Care ..................................................................................................................  130
8.2
Checks...............................................................................................................  130
8.3
Maintenance of PPU-E 15.................................................................................  131
8.4
Maintenance of PPU-E 30 and PPU-E 50 ..........................................................  133
9
Troubleshooting ................................................................................................... 135
9.1
Product does not move ....................................................................................  135
9.2
Product does not achieve the cycle times ........................................................  135
9.3
Product gets too hot.........................................................................................  135
9.4
Axis drops down ...............................................................................................  135
05.00 | PPU-E | Assembly and operating manual | en | GAS 363238/389316
Table of Contents
75

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ppu-e 15Ppu-e 30Ppu-e 50

Inhaltsverzeichnis