Herunterladen Inhalt Inhalt Diese Seite drucken

SCHUNK PPU-E Serie Montage- Und Betriebsanleitung Seite 132

Elektrische pick and place-einheit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Maintenance
Interval
2,500 km
Yet at the latest
after 6 months
2,500 km
Yet at the latest
after 6 months
132
05.00 | PPU-E | Assembly and operating manual | en | GAS 363238/389316
Component
Activity
Y-axis
Lubrication of the axes with special grease
(no. GAS364056)
Lubricating procedure:
• Evenly distribute a thin layer of grease on
both sides of the running surface using
CleanTips.
• Slide the Y-axis back and forth through its
maximum stroke length.
Z axis
Lubrication of the axes with special grease
(no. GAS364056)
Lubricating procedure:
• Evenly distribute a thin layer of grease on
both sides of the running surface using
CleanTips.
• Slide the Z-axis back and forth through its
maximum stroke length.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ppu-e 15Ppu-e 30Ppu-e 50

Inhaltsverzeichnis