Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Of The Power Generator; Transporting The Power Generator - Eisemann T 4411 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.

OPERATION OF THE POWER GENERATOR

5.1.

Transporting the power generator

SUSPENDED LOADS
Risk of serious injury or death
No persons are allowed to stay under or in the area of suspended loads
Sling gear must be approved for the weight of the power generator
Pay attention to the correct centre of gravity for industrial trucks
Transport power generators at low lift heights
Secure the site of the accident and initiate immediate life-saving measures
Comply with the local and customised safety regulations during transport.
Remove all connected consumers and cables.
Close the canopy.
Pay attention to weight and dimensions, refer to Technical Data.
Use only approved slings with sufficient load-bearing capacity for rigging!
Attach the sling gear only on the lifting eye.
For transport by hand the power generator can be raised at the handles. For this swing out the
handles. Pay attention to the weight.
I
WARNING
NOTE
Seite 23

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

T 4411 eT 7410T 7410 e

Inhaltsverzeichnis