Herunterladen Inhalt Inhalt Diese Seite drucken

Christopeit CX 4 Montageanleitung Und Bedienungsanleitung Seite 21

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Assembly Instructions
Remove all the separate parts from the packaging, lay them
on the floor and check roughly that all are there on the base
of the assembly steps. In addition to the screw pack are more
screws to the appropriate attachment points. Please note that
a number of parts have been connected directly to the main
frame and preassembled. In addition, there are several other
individual parts that have been attached to separate units. This
will make it easier and quicker for you to assemble the equip-
ment. Assembly time: 60 min.
Step 1:
Attach the stabilizer (39+92) at main frame (68).
1. Attach the front foot (39) with the preassembled transport rollers
(38) to the main frame. Do this with the two screws (49), curved
washers (13), spring washers (15) and cap nuts (48).
Attention: Mount the front foot into right direction, so that the
transport rollers don't touch the floor during exercising.
2. Attach the rear foot (92) to the main frame (68). Do this with the
two screws (14), washers (70) and spring washers (15).
After assembly has been completed, you can compensate for
minor irregularities in the floor by turning the wheel at cap (91).
The equipment should be set up that the equipment does not
move of its own accord during a training session.
Step 2:
Assembling of the connection cable (28) to the motor cable (45)
and installation of support (25) at the main frame (68).
1. Place screws (14), curved washers (13) and spring washers (15)
accessibly beside the front part of the main frame (68).
2. Place the lower end of the support (25) against the main frame
(68) and push the plastic cover (37) with rubber ring (94) onto
the support (25).
Plug the ends of the two computer cable harnesses (28+45)
projecting from (25+68) together.
(Note: The computer cable harness (28) projecting from the
support (25) must not slide into the tube, as it is required for
later steps of installation.)
When joining the tubes, ensure that the cable connection will
not trapped.
3. Put one spring washer (15) and one curved washer (13) on each
screw (14). Push the screws (14) through the holes in the support
(25), screw into the threaded holes of the main frame (68) and
tighten lightly. (This screw connection point will screw firmly
at least in Step 4.)
21

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis