Herunterladen Inhalt Inhalt Diese Seite drucken

Preliminary Operations; Electrical Safety - Jacuzzi Young Collection series Installations Anweisung

Vorschau ausblenden Andere Handbücher für Young Collection series:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

PLEASE READ THE INSTRUCTIONS CAREFULLY BEFORE
INSTALLING
Important
Please ensure that you thoroughly check the product upon receipt
since we cannot accept responsibility for any damage reported af-
ter installation. Should you find any damage, please immediate-
ly notify the forwarder.
WE RECOMMEND CHECKING THAT ALL THE ARRANGE-
MENTS COMPLY WITH THE INSTRUCTIONS FOR PRE-
INSTALLATION.
I Unpack the bath and lift it only by the rim and never by any pipe
line or electric equipment (use protective gloves).
I Check for any damage or defects by removing the pro-
tective plastic film (damages from impact or scratches re-
ported after installation are not covered by our guarantee).
I Check that the clamps holding the rubber couplings
and the air lines are tightly fastened.
I The installation of the whirlpool baths can be made against fin-
ished (tiled) walls and floor.
The panels allow access to electromechanical devices in-
stalled under the bath rim, as well as proper aeration re-
quired for water-air mixture during hydromassage.
Aeration must be guaranteed also if Jacuzzi
not used (see "Instruction for pre-installation"). Panels
must be firmly installed and proper tools must be used
when being removed. Openings, holes, grids, used for
aeration, should not allow the introduction of objects
having a diameter of 12 mm or larger.

PRELIMINARY OPERATIONS

i
I (
1
) Place the tub in its location of installation. Level it and
adjust the height by manually turning the feet (A) located on
i
the corners of the tub (
NOTE:
The upper level of the tub, measured at the end of the
edge, must be at a height of 60 cm from the floor. To com-
pensate for possible irregularities of the floor, the bath feet
can be regulated from -0,5 + 1 cm
DO NOT TOUCH BLOCKING NUTS (G) MARKED WITH A
RED ARROW STICKER (
i
I (
2
) Mark on the floor a hole for each outer foot. One hole
is enough.
Remove the bath and drill the floor.
Insert screw anchors (B). Adjust center feet (A1) so they rest
i
firmly on the floor (
If the tub calls for installation of Jacuzzi
the edge of the bath, install them (
is positioned and secured in its location of installation.
®
1
).
i
2
).
1
).
®
tap fixtures on
i
5
) before the tub
i
I (
3 or 4, depending on the model
ble the drain column and connect it with a siphon, preferably a
plastic one.
If filling of the tub takes place via the column (dis-
pensed form overflow) you will need to install a specif-
ic DB-type protection unit (standard EN 1717), located
at least 15 cm above the edge of the tub. Concerning
system methods, we recommend you contact your wa-
ter company and/or your plumber.
I Before fixing the bath to the floor, a final test for possible wa-
ter leaks caused by transport damage should be made. Fill the
bath up to approx. 5-6 cm. above the uppermost hydromas-
sage jets.
Please make sure that all joints and fittings are thoroughly in-
spected, before emptying the tub.
i
I (
2
) Drain the bath and secure all outer feet with screws
(C) to the floor.
i
1
(
) Adjust center feet (A1) so they rest firmly on the floor.
I Connect the electrical box to the network and earth
system, following the electrical diagram and the direc-
tives contained in the chapter "Electrical Safety".

ELECTRICAL SAFETY

Jacuzzi
®
hydromassage products are safe appliances, manufac-
tured in compliance with EN 60335.2.60, EN 61000 and EN
55014 standards and approved by the Institute of Certification
SIQ (Certifying Institute). They are tested during production to
panels are
guarantee user safety.
Installation must be carried out by qualified and authorized person-
nel, in compliance with current national provisions.
It is the responsibility of the installer to select materials
based on their intended use, to carry out work correctly,
to check the condition of the system that the unit is to be
connected to so that it ensures user safety.
"Young Collection" Jacuzzi
ances and must therefore be securely located and connected in a
permanent manner, without intermediate junctions, to the
electrical supply and the protection system (earthing plant).
The electric system and earth system of the building must
be in working order and must comply with the legal provi-
sions and specific current regulations in that country.
For connection to the mains, it is necessary to install a disconnect-
ing omnipolar switch, and place it in an area that complies with the
safety prescriptions for bathrooms. This omnipolar switch must
guarantee that the contacts remain open at least 3 mm and be
suitable for voltages of 220-240 V and a current of up to 16 A.
In accordance with the regulations, the switch and other
electrical devices must be located in an area which cannot
be reached by the person who is in the whirlpool bath.
The installation of electrical devices and other equipment (sockets,
switches, etc.) in the bathroom must be in strict accordance with
8
) At this stage, assem-
®
whirlpool baths are class "I" appli-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis