STEP 2 - Support Assembly
STEP 3-Top Rail Assembly
STEP 4 - Trampoline Mat Assembly
When Attaching springs to the trampoline mat, Please be careful. You will need another person to help you with this
portion of the assembly. CAREFUL-When attaching the springs, the Connector Points can become pinch points since
the trampoline is tightening up.
A. Slide all Vertical Leg Extensions (6) onto the Leg Base(5) as
shown
B. Two people will be necessary at this point to assemble the
trampoline. One person lifts the Support Assembly from step
2 to a standing (vertical) position and inserts one of the
sockets of the Top Rail with Sockets (3) into the Vertical Leg
Extension portion of the Support Assembly. The other
person holds the other end and inserts that portion into the
other Support Assembly as shown. You should now have 2
Support Assemblies held together by 1 Top Rail with Socket
B. Now, install the other 4 Top Rails (4) into the gaps between
the Vertical Leg Extensions (3) by inserting them into the
slots as shown.
97
EN