10. Release the 2 snap locks in the leg section
by pulling out the locking pin and turning
it clockwise.
11. Tip the leg section down, lift it away
from the base, and place the section
on the floor. Tip the head section away
from the base, and place it onto the
floor.
12 Plug the mains cord into the socket
outlet, and adjust the bed´s height
completely down.
The dividable base can
be dismounted this way:
1.
Hand control and control unit is tilted upwards and removed.
2.
The snap lock at the control unit (in the head end of the base) is released.
3.
The shear arm is raised to vertical by grabbing the handle, and is lifted away from the base.
4.
Assembly is done in reverse order.
1.
3.
To avoid person injury, it is essential, that the snap lock between base and shear
arm is correctly engaged. Pay attention to the cables also - no cables must be
trapped between shear arm and base.
UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06.indd 25
10.
12.
2.
4.
25
2011-11-08 15:24:22