Herunterladen Inhalt Inhalt Diese Seite drucken

EdilKamin MAXIMA series Installations-, Betriebs- Und Wartungsanleitung Seite 71

Pellet-heizkessel
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 202
I
C
A
B
Fig. 1
N
M
L
Fig. 2
R
Q
Fig. 3
INSTALLATION
H
G
E
F
D
O
P
Q
PELLET HOPPER DISASSEMBLY
In order to facilitate transport, the boiler is prepared for
the disassembly of the pellet hopper.
Proceed as follows:
Note:
1) When moving an already installed boiler, rst di-
sconnect the power cord.
2) All components are secured with screws to be remo-
ved for their disassembly.
Fig. 1
• Remove the two doors (A and B), the side panels (C and
D) and the rear panels (E and F).
• Remove the pellet cover (G), the rear panel (H) and the
front panel (I).
• Detach the connectors of the control panel.
Fig. 2
• Remove the wheeled ash tray (L) and the "L" profi le
complete with magnets (M).
• Remove the top cover (N), the slotted-in pellet hopper
protection grille (O) and the under-top plate (P).
Fig. 3
• Remove the two galvanized sheet-metal protections (Q
and R).
- 71
-

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Maxima 24

Inhaltsverzeichnis