Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch CRS 845H Instandsetzungsanleitung Seite 61

Prüfsatz für common rail pumpen
Vorschau ausblenden Andere Handbücher für CRS 845H:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.
Calibrating high-pressure
rail
i
The pressure senor 1 681 032 095 and the high-pres-
sure pump 1 687 222 188 are required for calibration
of the high-pressure rail.
i
Replace the filter prior to calibration of the high-pres-
sure rail (refer to Section 6.9).
7.1
Clamping high-pressure pump
i
The following additional clamping elements are
required for adapting the high-pressure pump
to the flywheel of the EPS: Intermediate flange
1 685 700 140, drive coupling 1 686 401 024, guard
1 685 510 148, guard ring 1 685 510 176.
6
5
4
3
2
Fig. 33:
Clamping high-pressure pump
1. Attach the intermediate flange 1 685 700 140
(Pos. 4) and the drive coupling 1 686 401 024
(Pos. 3) to the flywheel of the EPS.
2. Slide the guard 1 685 510 148 (Pos. 6) onto the
clamping bracket and secure it in position on the
EPS clamping bracket by way of the clamping screw.
3. Slide home the guard ring 1 685 510 176 (Pos. 5)
on the guard (Pos. 6).
4. Position the high-pressure pump (Pos. 1) on the
clamping bracket and attach to the drive coupling
(Pos. 3).
5. Attach the high-pressure pump to the clamping
bracket by way of the two clamping screws (Pos. 2).
Robert Bosch GmbH
Calibrating high-pressure rail | CRS 845H | 61
5
Fig. 34:
Fitting guard ring
6. Slide the guard ring (Pos. 5) over the drive coupling
and secure.
1
en
|
1 689 975 229
2011-09-16

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis