Bosch VLH 4x45 Erstinbetriebnahme Seite 43

Inhaltsverzeichnis

Werbung

3.14
Fitting front roll-off guard
!
The front roll-off guard is only to be fitted at the
front end of the left runway (runway at control
column).
Screw on the roll-off guard at the front end of the
left runway.
Fig. 24:
Front end of left runway
1 Roll-off guard
3.15
Setting cable monitoring switch
!
The rope monitoring switches are adjusted when the
running rail is lifted and under a load.
1. Raise the lifting platform under a load (average sized
vehicle) to approximately one meter high.
i
Do not press the setting-down button. The running
rail may only be borne by the wire ropes.
2. Set the actuating lever of the cable monitoring
switch at each column.
1 1
Fig. 25:
Dimension: 1 mm
1 Cable monitoring switch
i
The clearance between the limit switch cam and
actuating element must be set to 1 mm.
Robert Bosch GmbH
!
Check function:
1. Without a load.
2. Place a piece of wood under the running rails, and
3. After checking, remove the wood.
!
!
!
1 mm
Installation | VLH 4x45 | 43
If the lifting platform is lowered to a hindrance, the
movement of the running rails must stop. Lifting
should remain feasible, however (first switching
position).
the lower the lifting platform.
If a rope breaks, the all directions of movement
of the platform are disabled (second switching
position). This prevents the running rails from
assuming a hazardous angle.
If a rope breaks, the rope monitoring switch is
enabled, and the safety lever stop presses against
the retaining rod.
You do not have to check the second switching
position.
en
|
1 689 978 561
2017-07-14