36 | VLH 4x45 | Installation
3.5.4
Arrange wire ropes and hoses
1. Remove the hoses, cables and free ends of the wire
and cables from the front end of the power rail.
Fig. 8:
Single pulleys at front end of main runway
1 Wire rope for column 1 (operating column)
2 Wire rope for column 3
2. Pull the hoses, cables and free ends of the
suspension cables out of the rear end of the main
runway.
Fig. 9:
Double pulleys at rear end of main runway
3 Wire rope for column 4
4 Wire rope for column 2
3. Arrange the free ends of the wire rope and place
them corresponding to the subsequent installation
position.
i
Refer to Section 3.4 for cable routing diagram.
4. Pull the hoses and cables out of the ends of the
secondary runway.
|
1 689 978 561
2017-07-14
3.6
Fitting cross members
3.6.1
Positioning cross members
!
Ensure the correct orientation:
$
The cable sheave cover (Fig. 10, 1) must face upward.
$
The opening (Fig. 10, 2) must face the power rail.
1. Position two approx. 250 mm high wooden blocks
in front of the two runways.
2. Set down the front cross member on the wooden blocks.
3. Position two approx. 250 mm high wooden blocks
behind the two runways.
4. Set down the rear cross member on the wooden
blocks.
Fig. 10:
Rear crossmember (between S2 + S4)
1 Pulley cover
2 Opening for main runway pulleys
i
With the front crossmember (between S1 + S3),
the opening (Fig. 10, 2) is smaller than the rear
crossmember.