Herunterladen Inhalt Inhalt Diese Seite drucken

GE DPI612 Sicherheits- Und Schnellstartanleitung Seite 17

Vorschau ausblenden Andere Handbücher für DPI612:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 41
Safety and Quick Start Guide
When using the DPI612 - HFP for the first time, fill the reservoir with the
correct hydraulic fluid (Fluid type: Demineralised water or a mineral oil
(Recommended ISO viscosity grade ≤ 22)). Fill and prime the pressure station.
If new, remove the red plastic blanking cover from the Test port.
Fill the reservoir using the procedure that follows:
Filling and Priming the pump
1
6
11
Step
Procedure
1.
Turn the Refill valve fully counter-clockwise (Ref: Item 11).
2.
Turn the Volume adjuster fully clockwise (Ref: Item 2.1).
3.
Turn the Release Valve Stem fully counter-clockwise (Ref: Item 5).
4.
Remove the Priming pump piston/Release valve stem assembly.
Page 17 of 20
2
7
12
Remove Priming
Pump
3
8
13
[EN] English – 109M0089
Druck DPI612
4
x5
9
10
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis