Herunterladen Inhalt Inhalt Diese Seite drucken

Transportation And Handling; Installation; Operation - Quick MILL Evolution ’70 PULSANTI Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Evolution ’70 PULSANTI:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mod. Evolution '70 pulsanti
Touch the machine with wet or damp hands or
feet;
Turn over or lay the machine and packaging on its
side.
Clean the machine using a direct spray or water
under pressure, or with steam;
Immerse the machine in water or any other type of
liquid;
Lean liquid containers against the machine.
The machine is not intended for use by persons
(including children) with reduced physical, sensory
or mental abilities, except in the case where they
have received assistance or training in the use of
the equipment by a person who is responsible for
their safety. Adopt the precautions necessary so
that children cannot touch the equipment.
Whenever the machine appears to wet or
overly damp, do not proceed with installation
and use until it can be determined that the
machine has completely dried.
In any event, it is necessary to have the service centre
perform an inspection to ascertain if any damage has
occurred to the electrical components.
Precautions for use
The machine is to be operated only for its intended use
and not for any other purpose, such as the grinding and
delivery of products which are not coffee or non-food
products.

7. TRANSPORTATION AND HANDLING

7.1. Packaging
During transport, always keep the package in the
correct position referring to the indications printed on
the outside of the box.
Do not turn over or lay the machine and packaging on
its side.
The packaging contains loose parts and accompanying
documentation which is to be kept for further
consultation.
Open the upper part of the package, remove the
accessories and then slip the machine from the
wrapper.
Check the integrity of the machine, the accessories,
the power supply cable and plug, and in the event
of damage contact the retailer immediately.
The
packaging
polystyrene, nails, cardboard, etc.) must not
be left within the reach of children as they
are a potential sources of danger.
Avoid release to the environment. Dispose of them at a
local waste disposal company.
material
(plastic
bags,

8. INSTALLATION

The machine is shipped ready for installation in
accordance with the data found rating plate.
Ensure that the machine specifications comply with
those of the local electrical power supply.
The electrical system must be equipped with an
efficient residual current device or an automatic circuit
breaker with an efficient earthing system. In the event
no electrical safety device is present, have a qualified
technician install a two pole rocker switch/thermal-
magnetic circuit breaker as required by current safety
regulations.
Proper earthing of the device is mandatory.
The manufacturer declines all responsibility
in the event this health and safety
regulation is not respected.
Be careful not to damage the power supply cable by
bending, crushing or stresses.
Do not disconnect the power supply to the machine by
pulling on the cable. Disconnect by handling the plug.
It is advised to avoid positioning the machine in tight
spaces or avoid disruption to its operation, supply or
maintenance.
The surface where the machine is to be installed
must be level, dry, durable and stable, and at a
height of at least 80 cm from ground.
Position the machine and connect the power
supply cable to the electrical socket.

9. OPERATION

9.1. Filling
Fill the water reservoir with water, softened, drinking
water if possible. Insert the reservoir, making sure that
the rubber dip tube is not crimped or bent.
9.2. Switching on
Set the general switch to position 1 to power the
machine. The LEDs corresponding to the push-buttons
light up in sequence for 4 seconds and then turn off.
When the machine is used for the first time,
let approximately 0.5L of water flow through
the machine at operating temperature to
flush the hydraulic circuit.
9.3. Switching ON/OFF
Press the T1 single coffee dose key to switch the
machine on. The LEDs light up.
The coffee resistor ON indicator lights up during the
heating phase. In versions with a double exchanger
(only mod. 3140/3145) there is a steam resistor
indicator which lights only after the coffee circuit
Rev.00
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis