INSTALLATION
Preparations
Pressure-tested, with pressure-tested tap
9.1.2 DCE 11/13 | DCE 11/13 RC undersink installation for
washbasin
Non-pressurised, with non-pressurised tap
Pressure-tested, with pressure-tested tap
www.stiebel-eltron.com
9.1.3 DCE 11/13 H oversink installation for washbasin
Non-pressurised with non-pressurised tap
Pressure-tested with pressure-tested tap
9.2
Minimum clearances
≥20
f Maintain the minimum clearances to ensure trouble-free op-
f
eration of the appliance and facilitate maintenance work.
DCE 11/13| DCE 11/13 RC| DCE 11/13 H |
≥20
25